Pile and Diaphragm Wall Concrete

Pile and Diaphragm Wall Concrete

Technical Information

  • • Minimum compression resistance of 300 kg/cm2
  • • It complies with the quality requirements for Class 1 concrete (N.T.C. of the R.C.D.D.F. (Mexico City's  Regulations for Constructions)) and ACI 201
  • • Water /Cement (W/C) ratio between 0.55 and 0.45
  • • Drying Contraction less to 700 millionth
  • • Made with cement resistant to sulfates and with low alkali-aggregate reactivity
  • • Slump dissipation of 6 hours Slump 18 to 22 cm with workability of up to 10 hours and final slump of 8 to 12 cm
  • • Setting times: initial: 20 hours, and final of 36 hours
  • • Fines contents of 500 to 600 kg/m3
  • • Guarantee age of 28 days

Advantages

  • • High dissipation times of slump and high workability, easy to place, distribute, and finishing, among others
  • • Non segregable concrete, which avoids blockages in the tremie tube

Uses

  • • Specialized concrete for casting of piles and diaphragm walls
BUYING?
A NEW WAY TO CONNECT

A NEW WAY TO CONNECT

Conexion Moctezuma offers you interesting content about our passion.

+ information


We broke a 3rd record of supply in MIYANA!

We broke a 3rd record of supply in MIYANA!

Concretos Moctezuma works always assuring the quality that big projects require.

+ information


We build value

We build value

In Moctezuma we offer customized services thanks to our technical capacity and unique products.

+ information


Products

Products

We manufacture concrete of the highest quality.

+ information


AUG 14,2015

Proyecto Libramiento Sur Guadalajara (Available only in spanish)

Concretos Moctezuma y CYM Infraestructura trabajan en conjunto para su desarrollo.

Proyecto Libramiento Sur Guadalajara (Available only in spanish) Proyecto Libramiento Sur Guadalajara (Available only in spanish)

Concretos Moctezuma y CYM Infraestructura trabajan en conjunto para su desarrollo.

+ information


APR 09,2014

Moctezuma breaks record at MIYANA complex

Concretos Moctezuma made its biggest supply ever.

Moctezuma breaks record at MIYANA complex Moctezuma breaks record at MIYANA complex

Concretos Moctezuma made its biggest supply ever.

+ information


AUG 09,2013

Concretos Moctezuma Accredits The Calibration Laboratory Before EMA

This project was supervised by our team of Laboratory Quality, ISO 9000 and the Technical and Engineering area.

Concretos Moctezuma Accredits The Calibration Laboratory Before EMA Concretos Moctezuma Accredits The Calibration Laboratory Before EMA

This project was supervised by our team of Laboratory Quality, ISO 9000 and the Technical and Engineering area.

+ information